# Delete scheduled job

<p class="callout danger">Scheduled jobs should ONLY be deleted by administrators with access to the code base.</p>

If a scheduled job is no longer needed, rather than deleting it, disable it, leaving a chance for it to be reactivated if ever needed.

[![output.gif](https://how-to-erp.dewesoft.com/uploads/images/gallery/2024-05/rVSoutput.gif)](https://how-to-erp.dewesoft.com/uploads/images/gallery/2024-05/rVSoutput.gif)