Run a scheduled job manually Some scheduled jobs can be run manually from the ERP, if a need for that ever arises. Manual runs should not be the norm, as scheduled jobs are configured to auto-run atregular intervals. To run a scheduled job, go to scheduled job's edit page and look for the " Run scheduled job now " button in the top right corner of the page. On clicking it, the scheduled job will perform a manual run. Once the manual run is completed, it will be displayed on the list of last 30 runs logs with the message "on demand run". If this " Run scheduled job now " button is not present, the job cannot be run manually.