Skip to main content

Run a scheduled job manually

Some scheduled jobs can be run manually from the ERP, if a need for that ever arises. 

To run a scheduled job, go to scheduled job's edit page and look for the " " button in the top right corner of the page. On clicking it, the 

image.png

If this button is not present, the job cannot be run manually.