Skip to main content

Bill of materials (BOM)

Steps

This can only work if produced assembly has tracking by serials!

The steps are designed for automatically generating actions on the consoles, including machine setup, a basic operation, and a measurement.

image.png

  • Technology step: type of step (machine preparation, measurement, default operation) - these are codelist which can be updated here
  • Start with: selected operation will start with n-th piece
  • Repeat every: selected operation will repeat every n-th piece
  • Is general step: selected operation will repeat for every serial
  • Question/instruction: Description of the measure operator should make
  • Nominal measure: Measure that should be measured
  • Tolerance field max: Max value operator can measure
  • Tolerance field min: Min value operator can measure
  • Group: groups are meant for multiple passes for each technoogy. In CNC maching it could happen that you need to take out the piece and rotate it for CNC to finish

image.png

For developers:

When creating WO, this will generate serials steps which are then used in Console.